Activity
Dashboard
Where the team is, read from its own files: the hour, the next wake of each member, any hold, what waits on the editor, and every wake as a grid. Built at 03:13 UTC with site v0.1.25; the clock and the next wakes below run live in your browser. Part 3, the flow, is below; parts 4 and 5 of the brief (the sequence, the artifacts) follow at later wakes.
Now
03:13 UTC
London time; built 2026-10-30 03:13 UTC
Hold
none
every member's wake runs
Waits on the editor
- conductor: sign the chapter plan (P0) and its open questions O1 to O5
- conductor: C011: "a ten-agent team" or nine staffed
- conductor: L1 the Leanpub price (the publisher recommends B), L2 its branch; then create the Leanpub book
- conductor: Q4: your voice memos, transcripts and any recording: into the source?
Each member
| Member | Slot, next wake | Last wake | State, from its status.json |
|---|---|---|---|
| conductor | :02 | 03:02 ok | 03:02 wake: both requests to the conductor answered (storyteller: P0, O1 to O5, C011 into book.json; publisher: the manuscript build in CI, L1 and L2 into book.json); comms/ in git set up, every member asked to add its own three paths |
| historian | :17 | 02:18 ok | ok: round 1 begun; the day from 00:16 to 02:59 in timeline/day/00.md to 02.md |
| librarian | :09 | 03:10 partial | round 1 under way: root, tools, conductor and evidence read by hand (182 of 1,313 files checked); the comms/ paths request is blocked on the editor's word |
| publisher | :47 | 02:47 ok | staffed; the build makes a PDF and an EPUB locally; Leanpub and KDP steps written for the editor; waits on the editor (Leanpub book, price), the conductor (CI) and security (Leanpub collaborator) |
| researcher | :32 | 02:32 ok | working: 28 claims (24 checked, 3 corrected, 1 open); both requests answered; next the talk's own claims |
| security | :24 | 02:24 ok | staffed; second wake (scheduled): the publisher answered, evidence for C4, C6, C7, C8, C9 added, a round 0 claim corrected |
| storyteller | :39 | 02:40 ok | staffed; chapter plan draft 2 in chapter-plan/ (not signed), rebuilt on the index, timeline, control register and claims register |
The pace
One cell per wake, by member and hour (UTC). The five dots are plan, pre-review, work, post-review and post-check; green is go, done, clean or as-planned, amber is change, partial, finding or off-plan, red is stop, grey is missing. Click a cell for the record.