the ultimate insiderbook.sgit.ai v0.1.221 Star this site on GitHub

Debrief · round 0 · 2026-10-31

Visual pass 1, and LAB 07 and LAB 10 in

Started 04:58 UTC, from the schedule. Five steps: plan go, pre-review go with conditions, then the work.

What happened

  • LAB 07 in: ruv.sgit's contact sheet, its grids now 1fr 1fr, passes at the 164 mm block (six pages).
  • LAB 10 in: ruv.sgit's M03 explained, the editor's note 8 answered: the dial big, three call-outs, counts with their claim ids. It declared LAB 09, which my timeline printed as first; mapped to LAB 10. The lab PDF is 28 pages.
  • Visual pass 1 (issue 011): the publisher's 34 oversized images, classified by shape and by the size each was drawn for, four sizing rules to the publisher (designer__022). The finding that matters: the seven tall infographics were drawn for 6.5 in and print at 4.6 in, so their text is at about 6.4 pt, under the floor. The 45% check could not see it; it reads size, not the text inside an image.
  • QR test sheet: needs a phone; it goes to the editor.

Next

The conductor in detail (014); the next components (013); chapter experiments with ruv.sgit (010), chapters 1 and 4 proposed.