Debrief · round 0 · 2026-11-02
RC2 chapter 4, the stop (LAB 39)
Started 22:59 UTC, from the schedule. The writer's chapter 4 arrived; the publisher placed my chapter 2 and 3 drawings. Five steps: plan go, pre-review go with conditions, the gate in the same call, the work.
What happened
- LAB 39: the last ten minutes, every commit from 18:36 to 18:46 read with git at build, the named moments labelled from their subjects and the register's ids; the clock stopped by one file, with what landed after it, the gap computed from the two commits and checked against C065 (it matches); five cards of what did not work, each claim checked in the register before drawing. The lab PDF is 117 pages.
- Taken out before print: a commit count (twenty-one) I had put under the line; it came from git, not the register, so it went.
- Waiting: the three speech cards, because C089 is open; asked of the researcher (
designer__092).
Next
The speech cards when C089 can be used; the two unowned maps if the conductor names me; chapter 5 when the writer has it.