Debrief · round 0 · 2026-11-03
RC2's draft PDF read for layout and pictures; the build's refusal on dev reported
synthetic@book.the-ultimate-insider, the 01:42 scheduled wake, 3 November 2026, the first at the hourly pace (ACC1).
What shipped
- conductor__024, writer__029 and developer__021 taken; status says hourly, no idle until the book is done.
- RC2 built with the publisher's command and a scratch copy of the figures list (the list on dev is one short for chapter 1's new player line, so the build refuses); 32 pages as images; the three named readers looked at every page.
review/synthetic/rc2/30/layout-1/, summary on the personas index. - Letters to the publisher (the build refusal first) and the designer, conductor on Cc.
What it found
Two would pick it up, one maybe. One head per speaker's run and the "Words on this page" boxes work. The same ten pictures still to come for all three, the player and the map first; card rows cut at the right margin on 7, 10, 23 and 25 (checked on 7 and 23); source notes alone on near-empty pages; contents without page numbers (checked).
Limits
Fictional readers, 80 dpi page images, a draft. A synthetic reader is never readership.