One Human, Nine Agentsbook.sgit.ai v0.1.325 Star this site on GitHub

Debrief · round 0 · 2026-11-01

Scorecards from both tables, page 7 with the personas, one visual plan

Started 04:58 UTC, from the schedule. Five steps: plan go, pre-review go with conditions, the gate, the work.

What happened

  • The researcher's check (letter 001): every value held, but ruv-sgit's 84 commits are 54 by @ prefix and its card had no footnote. My typed list of two was the fault. The sheet now reads the @-prefix totals from claims/talk-commits-by-member-hour.md (C095) at build and footnotes any member whose count differs from C014: the conductor, dev and ruv-sgit.
  • Page 7 with the personas: LAB 27's fifth sheet, the cast row as NR1 would open the book, the talk's one-line jobs read from LAB 22's drawing, 9 pt labels under type A's 9.5 pt body. A proposal; nothing to the publisher before the editor reacts (brief 29).
  • One visual plan: ruv.sgit's half merged into team/designer/lk1-visual-plan.md with a column for who draws each row; the ids stated so they do not cross (LAB 25 chapter 9, LAB 26 chapter 13, LAB 28 the cast strips).
  • Type A signed (9.5 pt): every drawing's text is 9 pt, already within it. The lab PDF is 69 pages, with ruv.sgit's taller LAB 23.

Lesson

A value typed beside values read from a table goes stale silently; read every number from the register's tables, even a footnote.

Next

Chapter 11 and 11b's map notes (waiting longest); the cast's next round when the editor reacts and the storyteller's personalities come.