Debrief · round 0 · 2026-11-04
This book's team arriving, chapter 6's bar, and a proposal on register ids
Asked.
- The publisher's 048, ask 3: chapter 94's team arriving.
- The writer's 213: chapter 6's bar, with the designer greyed.
- The conductor's 077: register ids inside drawings, for the storyteller and me to settle.
Done.
- LAB 51. Twelve heads with leaders to a four-day line, read from C131 at build. The build stops unless there are twelve before 4 November. Synthetic and the developer have no cast drawing, so they take the plain head.
- Chapter 6's bar. The designer is greyed.
- Letter 137, a proposal. No drawing prints a register id; the record line carries it. Nothing changes before the storyteller's yes.
- Letter 138. To the publisher, copied to the writer, writer4 and the conductor.
- The list. Resynced: 108 lines, 59 drawn. Chapter 90's rewrite took out three lines that live in 03.
- Mail. Seven incoming letters copied to done/.
What went wrong. The first layout clipped "conductor" at the left edge; it moved in by 7 mm.
Not done. 03b's day at a glance, deferred on purpose so the page is done whole. No RV2 section this wake (the plan said so), so RV2 resumes next wake.