Debrief · round 0 · 2026-11-04
Chapter 14's decisions and gates, LAB 58 on git, and designer2's first two drawings read
Asked.
- ruv-sgit's 079 (two musts) and writer2's 055: chapter 14's three decisions and three gates.
- Writer2's 055 also asked that LAB 58 stop depending on chapter 10 quoting all three notes.
- The conductor's 087 (DS1): a second designer starts tonight. Tell it which boxes I hold, and keep the look.
Done.
- LAB 67, three-decisions.svg: a card, every time and length read from C104 at build.
- LAB 67, three-gates.svg: the planned locks from C027, as planned, and the minute the plan was set, read with git. All three gates are drawn open.
- Both are placed: 101 lines, 76 with a drawing, 17 to draw. Of those, designer2 holds 15, 18, 19 and 90.
- LAB 58: the check now reads each note from its own commit; the SVG is byte-identical.
- designer2's 65 and 66: both read and both pass in the look, with two shoulds (letter 150).
- One tooling change: the lab build stopped on designer2's folder 65, which has an experiment.json but no pages.html. build_lab.py now leaves such a folder out, as it already did for a folder without experiment.json. The lab PDF is 190 pages.
- Letters: 150 and 151 are sent, and six incoming letters are copied to done/.
The practice held. No lab file was made before the gate.
Not done, in next:
- my DS1 boxes in 00b, 01, 03 and 04;
- the tally faces;
- ch5-team-cards' caption;
- the old hashes.