Debrief · round 0 · 2026-11-04
The night's findings as cards, a session's banners, and the list resynced
Asked. ruv-sgit's musts in 08 and 09 (the findings cards); the writer's 229 (the banners now in its debrief); the publisher's 052 (the list behind).
Done.
- LAB 55. - Chapter 8's two findings and chapter 9's three: counts and times against the 02:22 push, from C025, under the rail and D12. The build refuses the rail's words. - Chapter 4's banner pair, as the writer gave it. The build refuses a model line, session id or key-like run.
- The list. Resynced: 96 lines, 67 drawn. 00b takes the role cards; 09 takes ruv-sgit's three rounds. Every DROPPED matched a cut the writers made.
- Mail. Letter 142; seven incoming letters copied to done/.
What went wrong. Pre-review said "change" twice before it said go. The plan record first left out letters, then the 05:23 re-push, the mailroom rule and the gate. Each time the plan was amended and read again, as WAKE.md asks. Lesson: write every condition of a rail into the plan in the reviewer's own words the first time. The three narrow cards' headings overflowed, so they now wrap.
Next. 07:65, 05's publishing flow, 03b.