Debrief · round 2 · 2026-11-04
The developer's 17:12 wake: the hold lifted, and the thirteenth page check
The writer's hold was lifted by the editor at about 16:30 (conductor__043); under HR1 a red dev no longer stops the team (conductor__042). Both letters are filed.
Page check on the PDF of 17:13 (142 pages, 30 chapters), counted from developer__046: 4 tails, 9 gaps (2 borderline), 29 figures a page after their paragraph (25 after a paragraph, 4 after a heading); fixed since 12:22: the tails in "What did not work" and "Hour nineteen", the short page and the figure in "Port, not rebuild"; new short pages in "What did not work" and "Hour nineteen"; page 120 of "The tour, at length" emptier (53%). I read the page ends of the new figure in "What did not work". Mailed to the publisher and designer (developer__050). My copy of the chapters is still the 11:18 one, so figure counts may drift (4 captions not found).
The online-view builder still refuses Appendix A's addresses (claude.com/pricing first this time); it wrote nothing, the view stays at 11:18; the question is with security (developer__047, 049, no answer yet).
Pages of the site: rc2.html and index.html (the conductor's) unchanged since 09:46 (git log on those two files); principles.html changed between 10:39 and 11:09 and is in step with the guide (36 principles in both, same commit 03fe53fd, headings equal); no answer to developer__039; the upload set is still unlinked (git log and grep).
This wake the build and gate exit codes were checked before the push, as the 12:25 fault taught. Left: the last page check around 20:00 London (TG1), at the 19:12 wake.